Q. The following item of earth work is not measured separately ?
a.
Setting out of works
b.
Site clearance
c.
Steps in deep excavation
d.
All the above
ANSWER: All the above
Answer & Explanation
No explanation is available for this question!
« Previous
Next »
Related Content
Maximum permissible velocity 1.5 m/sec, ...
Sand particles are made of______________...
A compound bar consists of two bars of e...
The point in the immersed body through w...
In prestressed concrete______________?
Top bars are extended to the projecting ...
Compressibility of sandy soils is_______...
For laying the railway track, materials ...
The moment of inertia of a triangular se...
In an internal focussing type of telesco...
The sewerage system originates from_____...
If three forces acting in different plan...
A particle moves in a straight line and ...
A system of copianar forces is in equili...
A load ‘W is moving from left to right...
The effective span of a simply supported...
The anchorage value of standard U-type h...
Minimum spacing between horizontal paral...
The effective width of a column strip of...
A square column carries a load P at the ...
Which of the following is an incorrect s...
The maximum value of hoop compression in...
The mechanism method of plastic analysis...
The number of funicular polygons which c...
A runoff river plant is____________?
intensity of pressure at a depth h on a ...
A pre-stressed concrete member__________...
The correct sequence of these operations...
What is the ordinary interest on P1,500....
The rate of Alteration of pressure filte...
Discussion
➨
Post your comment / Share knowledge
Counter
Online Test
MCQs
Trending
Latest Jobs
▲