Q. The direct cost of a project with respect to normal time is________________?
a.
minimum
b.
maximum
c.
zero
d.
infinite
ANSWER: minimum
Answer & Explanation
No explanation is available for this question!
« Previous
Next »
Related Content
Optimum depth of kor watering for rice i...
The best unit duration of storm for a un...
The settlement velocity of a solid (diam...
The expected out turn for earth work in ...
The brick work is measured in sq metre, ...
The condilion for a lifting machine to b...
Select the correct statement __?
The external wind pressure acting on a r...
Intersection method of detailed plotting...
A symmetrical body is rotating about its...
Minimum composite sleeper index pres-cri...
The steepest gradient permissible on a 2...
The percentage of reinforcement in case ...
The frog of the brick in a brick masonry...
If the ratio of long and short spans of ...
Which of the following is the unit of ki...
Salvage value is sometimes known as ____...
The item of steel work which is measured...
The permissible bending stresses Pbet fo...
is the pre-stressed force applied to the...
The bending stress in a wall or column s...
Center of gravity of a solid cone lies o...
Sand particles are made of______________...
The main disadvantage of cement concrete...
Joule is the unit of__________________?
For a tacheometer the additive and multi...
Acid regression stage of sludge digestio...
The reflection of solar energy is charac...
As compared to ordinary portland cement,...
A close coil helical spring when subject...
Discussion
➨
Post your comment / Share knowledge
Counter
Online Test
MCQs
Trending
Latest Jobs
▲