Tunnel Engineering Mcqs


Q.  In the construction of Metro Railways, “Cut and Cover” method of construction is suitable in situations listed at________________?
Consider the following situations
1. Soil is soft
2. Volume of existing surface traffic on the alignment is heavy
3. Track is at a deeper level
4. Water table is high


a. 1 and 2
b. 1 and 3
c. 1 and 4
d. 2 and 3



 
 

    Discussion

Post your comment / Share knowledge