Q. Critical path_____________?
a.
is always longest
b.
is always shortest
c.
may be longest
d.
may be shortest
ANSWER: is always longest
Answer & Explanation
No explanation is available for this question!
« Previous
Next »
Related Content
For design purposes, the normal rate of ...
Effective stress on soil_____________?
A car goes round a curve of radius 100 m...
Select the incorrect statement ?
The suitable method of forecasting popu...
Primary treatment of sewage consists of ...
ABC Corporation makes it a policy that f...
Which of the following is not a componen...
The deliberate lowering of the price of ...
A 2 m long ladder rests against a wall a...
Facultative bacteria are able to work in...
The total pressure on the surface of a v...
Which of the following is considered to ...
Which of the following retards the self ...
For determining the force in the member ...
Consider the following statements regard...
If the strain energy stored per unit vol...
Terzaghi’s general bearing capacity fo...
The amount of irrigation water required ...
As per IRC recommendations, the maximum ...
Which of the following methods of con-to...
A manhole is generally provided at each_...
At liquid limit, all soils possess______...
Mercury does not wet glass. This is due ...
The average coefficient of permeability ...
A T-beam behaves as a rectangular beam o...
For beams of uniform strength, if depth ...
A portion of an embankment having a unif...
If the length of an intermediate span of...
Coefficient of friction depends on______...
Discussion
➨
Post your comment / Share knowledge
Counter
Online Test
MCQs
Trending
Latest Jobs
▲