1) Grouping of all functionally related elements is known as ______ . a. Cohesion b. Coupling c. Both A & B d. None of the above
|
||||
2) CASE tools are used by software project managers, analysts and engineers to develop software system. a. True b. False
|
||||
3) The scope of CASE tools goes throughout the SDLC. a. Yes b. No
|
||||
4) Which type of DFD concentrates on the system process and flow of data in the system? a. Logical DFD b. Physical DFD c. Both A & B d. None of the above
|
||||
5) Every attribute is defined by its corresponding set of values is called ______ . a. Entity b. Domain c. Relationship d. None of the above
|
||||
6) Building an excellent product or system that no one really want a risk is a ________ . a. Technical risk b. Schedule risk c. Business risk d. Performance risk
|
||||
7) Budget is not a section in the standard SQA plans that are recommended in IEEE. a. True b. False
|
||||
8) In the management subsystem what is the functional elements and associated workflow will support the content object identification, version control, change management, change auditing and reporting? a. Content database b. Database capabilities c. Configuration management function d. All mentioned above
|
||||
9) Abbreviate the term ILFs. a. Interface logical files b. Internal logical files c. Input logical files d. Internal logical function
|
||||
10) What is a special set of ISO guidelines that developed to help the interpret standard for the use in software process? a. ISO 9001-2000 b. ISO 9001-2001 c. ISO 9000-3 d. ISO 9000-4
|
||||
11) The ability to encourage the technical people to produce their best ability is known as ______ . a. Organization b. Motivation c. Ideas or innovation d. None of the above
|
||||
12) Mechanics for refining the processing tasks that are required for software to accomplish in some desired function is ______ . a. Process decomposition b. Problem decomposition c. Functional decomposition d. None of the above
|
||||
13) Design phase is followed by ______ . a. Coding b. Testing c. Maintenance d. None of the above.
|
||||
14) In software maintenance tackling the changes in the hardware and software environment where the software works, is called ______ . a. Corrective b. Perfective c. Adaptive d. Preventive
|
||||
15) From the following which quality deals with maintaining the quality of the software product? a. Quality assurance b. Quality control c. Quality efficiency d. None of the above
|
||||
16) Function-oriented design is comprised of many smaller sub-systems is known as, Functions. a. Yes b. No
|
||||
17) State if the followings are true or false. For scheduling a project, it is necessary to: 1) Break down the project tasks into smaller, manageable form. 2) Find out various tasks and correlate them. 3) Estimate time frame required for each task. 4) Divide time into work-units. a. True b. False
|
||||
18) Software project manager is engaged with software management activities. He is responsible for ______ . a. Project planning. b. Monitoring the progress c. Communication among stakeholders d. All mentioned above e. None of the above
|
||||
19) Classes communicate with one another via ______ . a. Read sensors b. Dial phones c. Messages d. None of the above
|
||||
20) Software is not considered to be collection of executable programming code, associated libraries and documentations. a. True b. False
|