1) A good design review is not important for good software design and its accuracy and quality. a. True b. False
|
||||
2) In project execution and monitoring, every project is divided into multiple phases according to that in which phase of SDLC all major tasks are performed? a. Milestones checklist b. Status reports c. Activity monitoring d. None of the above
|
||||
3) Abbreviate the term PERT. a. Program Evolution & Review Technique b. Process Evolution & Review Tool c. Project Evalution & Request Technique d. None of the above
|
||||
4) Which is the degree where the software performs its required function? a. Correctness b. Clarity c. Completeness d. Consistency
|
||||
5) Which is the characteristics of Software risk? a. Uncertainty b. Loss c. Both A & B d. None of the above
|
||||
6) UI can be graphical text-based, audio-video based and depending upon the underlying hardware and software combination. a. True b. False
|
||||
7) Data flow diagram is a graphical representation of flow of data in an information system. a. True b. False
|
||||
8) Object Constraint Language (OCL) is a formal notation developed, so that users of UML can add more precision to their specifications. a. True b. False
|
||||
9) Which is the publishing subsystem that does not require any further processing and are transmitted directly to the client side? a. Static elements b. Publication services c. External services d. None of the above
|
||||
10) Techniques that allows a software engineer to understand how a work process is completed when several people are included, is called _______ . a. Work flow analysis b. Does not track potential risks c. Cover problem areas before they go “critical,” d. Does not adjust work flow or tasks
|
||||
11) Which model depicts the profile of the end users of a computer system? a. User model b. Requirements model c. Design model d. State model
|
||||
12) System classes define all abstractions that are necessary for human computer interaction (HCI). a. True b. False
|
||||
13) To compute Function Point (FP) which of the following relationship is used? Where Fi = complexity adjustment values. a. FP = count total *[0.01 *S(Fi)] b. FP = count total *[0.65 + 0.01 *S(Fi)] c. FP = count total *[0.65] d. None of the above.
|
||||
14) Measure of reliability is given by ______ . a. Mean Time between success. b. Mean reliable c. Mean Time between failure (MTBF). d. MTTR
|
||||
15) Which of the following provides semi-automatic and automatic support to methods in a layered technology? a. Methods b. Tools c. Process d. Quality Focus
|
||||
16) If the software process were not based on scientific and engineering concepts it would be easier to re-create new software than to scale an existing one, is known as________ . a. Cost b. Dynamic Management c. Large Software d. Scalability
|
||||
17) Abbreviate the term SRS. a. Software Requirement Specification b. Software Refining Solution c. Software Resource Source d. None of the above
|
||||
18) The process togather the software requirements from Client, Analyze and Document is known as ______ . a. Requirement engineering process b. Requirement elicitation process c. User interface requirements d. Software system analyst
|
||||
19) From the following which method will be adopted in Reuse process? a. Either by keeping requirements same and adjusting components b. By keeping components same and modifying requirements. c. Both A & B d. None of the above
|
||||
20) Which core steps are defined by six sigma methodology? a. Analyze b. Define c. Measure d. All mentioned above
|