1) The main disadvantage of line organisation is_________________? a. top level executives have to do excessive work b. structure is rigid c. communication delays occur d. all of the above e. none of the above
|
||||
2) A low unit cost can be obtained by following____________________? a. product layout b. functional layout c. automatic material handling equipment d. specialisation of operation e. minimum travel time plan and com¬pact layout
|
||||
3) The most important objective behind plant layout is_____________________? a. overall simplification, safety of integration b. economy in space c. maximum travel time in plant d. to provide conveniently located shops e. to avoid any bottlenecks
|
||||
4) Travel charts provide__________________? a. an idea of the flow of materials at various stages b. a compact estimate of the handling which must be done between various work sections c. the information for changes required in rearranging material handling equipment d. an approximate estimate of the handling which must be done at a particular station e. solution to handling techniques to achieve most optimum^ results
|
||||
5) Process layout is employed for_________________? a. batch production b. continuous type of product c. effective utilisation of machines d. all of the above e. none of the above
|
||||
6) Gnatt chart provides information about the________________? a. material handling b. proper utilisation of manpower c. production schedule d. efficient working of machine e. all of the above
|
||||
7) Basic motion time study gives times for basic motions in ten thousandths of_______________? a. second b. minute c. hour d. day e. none of the above
|
||||
8) Work sampling observations are taken on the basis of_______________? a. detailed calculations b. convenience c. table of random numbers d. past experience e. fixed percentage of daily production
|
||||
9) TMU in method time measurement stands for__________________? a. time motion unit b. time measurement unit c. time movement unit d. technique measurement unit e. time method unit
|
||||
10) Micro motion study is__________________? a. analysis of a man-work method by using a motion picture camera with a timing device in the field of view b. motion study* observed on enhanced time intervals c. motion study of a sequence of operations conducted systematically d. study of man and machine conducted simultaneously e. scientific, analytically procedure for determining optimum work method
|
||||
11) Choose the wrong statement Time study is used to_________________? a. determine overhead expenses b. provide a basis for setting piece prices or incentive wages c. determine standard costs d. determine the capability of an operator to handle the number of machines e. compare alternative methods
|
||||
12) Scheduling gives information about____________________? a. when work should start and how much work should be completed during a certain period b. when work should complete c. that how idle time can be minimized d. proper utilisation of machines e. none of the above
|
||||
13) The standard time for a job is_________________? a. total work content b. base time + relaxation time c. total work content + basic time d. total work content + delay contingency allowance e. total work content + relaxation time
|
||||
14) The allowed time for a job equals standard time plus___________________? a. policy allowance b. interference allowance c. process allowance d. learning allowance e. unforeseen allowance
|
||||
15) Micromotion study is__________________? a. enlarged view of motion study b. analysis of one stage of motion study c. minute and detailed motion study d. subdivision of an operation into therbligs and their analysis e. motion study of small components upto mirco-seconds
|
||||
16) String diagram is used when__________________? a. team of workers is working at a place b. material handling is to be done c. idle time is to be reduced d. all of the above e. none of the above
|
||||
17) What does symbol ‘V’ employ in work study________________? a. operation b. inspection c. delay/ temporary Storage d. permanent storage e. none of the above
|
||||
18) What does symbol ‘O’ imply in work study________________? a. operation b. inspection c. transport d. delay/temporary storage e. none of the above
|
||||
19) Work study is concerned with_________________? a. improving present method and finding standard time b. motivation of workers c. improving production capability d. improving production planning and control e. all of the above
|
||||
20) The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as_________________? a. Rowan Plan b. Bedaux Plan c. Taylor Differential Piece rate system d. Halsey Premium plan e. Day work plan
|