Production Technology Mcqs

Q.  Work study is concerned with_________________?

a. improving present method and finding standard time
b. motivation of workers
c. improving production capability
d. improving production planning and control
e. all of the above


ANSWER: See Answer
 
No explanation is available for this question!
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  The performance of a specific task in CPM is known as ______________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The artificial activity; which indicates that an activity following it cannot be started unless, the preceding activity is complete, is known as_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good______________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The probability distribution of activity times in PERT follows following distribution__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  If TL is the largest allowable event occurrence time, total activity slack (s) is equal to__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is Known as_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Critical Path Net Work helps an engineer_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The time which results in the least possible direct cost of an activity is known as________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the incorrect statement from the following. A critical ratio scheduling____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  CPMis___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT/CPM, techniques can be used for following applications____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Descripancies of bar chart techniques are________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Slack of various events on the critical path in PERT/CPM chart___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Activity s,lack or float of any event on a PERT/CPM chart is represented by__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  An event is indicated on the network by_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Positive slack on a PERT indicates that project is________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In PERT analysis, critical path is obtained by joining events having___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In a PERT chart___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pessimistic time is___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts