Estimating & Costing Mcqs


Q.  While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?

a. At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar
b. In thin slabs, 12 mm minimum or diameter of the bar whichever is more
c. For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more
d. All the above


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  The area is measured correct to the nearest___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the excavation where measurements are made in square metres for payment ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The trap which is provided to disconnect the house drain from the street sewer is called_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The measurement is not made in square metres in case of________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  While preparing a detailed estimate__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The most reliable estimate is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  According to ISI method of measurement, the order of the sequence is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The item of the brick structure measured in sq.m, is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Anti-siphonage pipe is connected to__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The concrete work for the following part of the building of specified thickness is measured in square metres_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The measurement is made for stone work in square metre in case of________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of 12 mm plastering with cement mortar is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Carpet area does not include the area of_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm