Q.  Which of the following states that work expands to fill the time available ?

a. CASE tools
b. Pricing to win
c. Parkinson’s Law
d. Expert judgement


ANSWER: See Answer
 
The cost is determined by available resources rather than by objective assessment. If the software has to be delivered in 12 months and 5 people are available, the effort required is estimated to be 60 person-months.
MCQs:  Which of the following is not project management goal ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Identify the sub-process of process improvement ___________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What type of software testing is generally used in Software Maintenance ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which selective retest technique selects every test case that causes a modified program to produce a different output than its original version?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Regression testing is a very expensive activity?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which regression test selection technique exposes faults caused by modifications ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not an appraisal cost in SQA ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The primary objective of formal technical reviews is to find _________________ during the process so that they do not become defects after release of the software?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  According to ISO 9001, the causes of nonconforming product should be____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The CMM emphasizes____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  ISO 9001 is not concerned with _______________ of quality records?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  CMM stands for_____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Who identifies, documents, and verifies that corrections have been made to the software ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not included in External failure costs ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which requirements are the foundation from which quality is measured ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Degree to which design specifications are followed in manufacturing the product is called_________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not included in failure costs ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The Capability Maturity Model (CMM) is a continuous model ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is not included in prevention costs ?
Category: Software Engineering Mcqs,   Published by: teswesm