Software Management Mcqs

Q.  Which of the following is/are main parameters that you should use when computing the costs of a software development project ?

a. travel and training costs
b. hardware and software costs
c. effort costs (the costs of paying software engineers and managers)
d. all of the mentioned


ANSWER: See Answer
 
Estimation involves working out how much effort is required to complete each activity and, from this, calculating the total cost of activities.
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  Which requirements are the foundation from which quality is measured ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Degree to which design specifications are followed in manufacturing the product is called_________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not included in failure costs ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The Capability Maturity Model (CMM) is a continuous model ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What is not included in prevention costs ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The ISO 9000 series of standards is a program that can be used for external quality assurance purposes ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  CO policy in CMM means___________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a maturity level in CMM ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  ____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a SQA plan for a project ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The CMMI assessment is based on a x-point scale. What is the value of x ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  It is always best to start process analysis with a new test model ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a part of process change ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What is a tangible output of an activity that is predicted in a project plan ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Process improvement is the set of activities, methods, and transformations that developers use to develop and maintain information systems ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  How many stages are there in process improvement ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Prototypes and 4GL business systems are categorized under which process ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What is often undefined and is left to the ingenuity of the project managers and engineers ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The documentation of a process which records the tasks, the roles and the entities used is called__________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts