Q.  Which of the following is not achieved by an automated estimation tools ?

a. Predicting staffing levels
b. Predicting software cost
c. Predicting software schedules
d. Predicting clients demands


ANSWER: See Answer
 
Demands can vary from client to client
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  According to ISO 9001, the causes of nonconforming product should be____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The CMM emphasizes____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  ISO 9001 is not concerned with _______________ of quality records?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  CMM stands for_____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Who identifies, documents, and verifies that corrections have been made to the software ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not included in External failure costs ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which requirements are the foundation from which quality is measured ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Degree to which design specifications are followed in manufacturing the product is called_________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not included in failure costs ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The Capability Maturity Model (CMM) is a continuous model ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What is not included in prevention costs ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The ISO 9000 series of standards is a program that can be used for external quality assurance purposes ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  CO policy in CMM means___________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a maturity level in CMM ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  ____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a SQA plan for a project ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The CMMI assessment is based on a x-point scale. What is the value of x ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  It is always best to start process analysis with a new test model ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts