Software Management Mcqs

Q.  Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?

a. The difficulty of the problem to be solved
b. High frustration caused by personal, business, or technological factors that causes friction among team members
c. The degree of sociability required for the project
d. The rigidity of the delivery date


ANSWER: See Answer
 
Development is irrelevant of social quotient.
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  Which risks are associated with constraints imposed by management or the marketplace ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is a systematic attempt to specify threats to the project plan ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What threatens the quality and timeliness of the software to be produced ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a business risk ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which risks are associated with the overall size of the software to be built or modified ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What threatens the viability of the software to be built ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  COCOMO stands for____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which one is not a risk management activity ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  COCOMO was developed initially by _____________________ ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  COCOMO-II was developed at _____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What all has to be identified as per risk identification ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which one is not a size measure for software product ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Estimation of size for a project is dependent on___________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which one is not a stage of COCOMO-II ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which model assumes that systems are created from reusable components, scripting or database programming ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which model is used during early stages of the system design after the requirements have been established ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts