Q.  Which of the following is not a build system feature ?

a. Minimal recompilation
b. Documentation generation
c. Storage management
d. Reporting


ANSWER: See Answer
 
To reduce the storage space required by multiple versions of components that differ only slightly, version management systems usually provide storage management facilities.
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  Commitments to unrealistic time and resource estimates may result in____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a project manager’s activity ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Who delivers the technical skills that are necessary to engineer a product or an application ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is a people-intensive activity ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which software engineering team has no permanent leader ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  SPMP stands for__________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Who interacts with the software once it is released for production use ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following paradigm attempts to structure a team in a manner that achieves some of the controls associated with the closed paradigm but also much of the innovation that occurs when using the random paradigm ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which paradigm structures a team loosely and depends on individual initiative of the team members ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which paradigm relies on the natural compartmentalization of a problem and organizes team members to work on pieces of the problem with little active communication among themselves ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not an effective project manager trait ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not an approach to software cost estimation ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  A software ______________ provides the framework from which a comprehensive plan for software development can be established?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not an effective software project management focus ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  If an Indirect approach is taken, then the sizing approach is represented as_______________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as___________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  If a Direct approach to software project sizing is taken, size can be measured in__________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts