Q.  Time study is__________________?

a. the appraisal, in terms of time, of the value of work involving human effort
b. machine setting time
c. time taken by workers to do a job
d. method of fixing time for workers
e. method of determining the personnel Requirement


ANSWER: See Answer
 
No explanation is available for this question!
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  The term ‘value’ in value engineering refers to_______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In the perpetual inventory control, the material is checked when it reaches its________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Merit Rating is the method of determining worth of_______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Works cost implies________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Standard time as compared to normal time is_______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In which of the following layouts, the lines need to the balanced_______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Which of the following layouts is suited to job production__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The amount deducted from the salary of workers towards employees provident fund is_______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Father of time study was_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Current assets include_______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Job enrichment technique is applied to_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In Halsey 50-50 plan, output standards are established______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  An optimum project schedule implies_______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Which one of the following represents a group incentive plan ?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In the Halsey system of wage incentive plan, a worker is ________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Break-even analysis can be used for__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT has following time estimate_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Which of the following incentive plansrensures a part of the swing to the worker and rest to the employer_______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Which of the following plans motivates supervisors by paying a premium on time saved by workers_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In Lincoln plan (one type of group incentive plan), the amount of the profit which an .employee receives in addition to the guaranteed basic _________________? pay/wages, is based on :
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts