Software Evolution Mcqs

Q.  Third Party Certification for software standards is based on ___________________?

a. Ul 1998, Second Edition
b. UT 1998, Second Edition
c. Ul 1992, Second Edition
d. Ul 1996, Second Edition


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  There are _______________ overlapping stages in the lifetime of large and complex sociotechnical systems?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which property of a sociotechnical system depends on the technical system components, its operators, and its operating environment ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Consider an example of a system which has a police command and control system that may include a geographical information system to provide details of the location of incidents. What kind of system the example represents ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The cost of re-engineering is often significantly less than the costs of developing new software ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The Incremental Model is combination of elements of_____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Reverse engineering is the last activity in a re-engineering project _____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Processes for evolving a software product depend on __________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Model preferred to create client/server applications is _______________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Spiral model was developed by ___________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which technique is applied to ensure the continued evolution of legacy systems ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  A sociotechnical system is a system that includes___________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The two dimensions of spiral model are ______________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Identify the correct statement with respect to Evolutionary development ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Program modularization and Source code translation are the activities of ____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Software evolution does not comprises ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Cost and schedule are a part of_________________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Number of errors found per person hours expended is an example of a____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Size and Complexity are a part of____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not categorized under Product Operation of McCall’s Software Quality Factors ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not categorized under Component-Level Design Metrics ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts