Waste Water Engineering Mcqs


Q.  The sludge does not contain waste water from_________________?

a. Bath rooms
b. Wash basins
c. Kitchen sinks
d. Toilets


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  The grit chambers of sewage treatment plants, are generally cleaned after__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Maximum permissible velocity 1.5 m/sec, is adopted in drains_______________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If the discharge of a sewer running half is 628 1.p.s., i = 0.001, and n = 0.010, the diameter of the sewer, is__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  running partially full with central angle , For a circular sewer of diameter__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In the activated sludge process__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The settling velocity of a spherical particle of diameter less than 0.1 mm as per Stock’s law, is__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Inter-distance between ventilation columns in a sewer line is kept__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The intensity of rain is expressed in________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which one of the following part of human body withstands minimum radiation ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Primary treatment of sewage consists of removal of__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Cement concrete sewers are only suitable if non-scouring velocity is between_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The most widely used pump for lifting sewage is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Setting out the alignments of sewers may start from__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Lead acetate test in sewer manhole is done to test the presence of ____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In a grit chamber of a sewage treatment plant ____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The ratio of maximum sewage flow to average sewage flow for mains up to 1 m in diameter, is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The arrangement made for passing the sewer line below an obstruction below the hydraulic gradient lines called ____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm