Management Accounting Test Questions


Q.  The responsibility centers, for control purposes, may be classified into _____ types.

a. Five
b. Three
c. Four
d. None of the above


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Breakeven point can be calculated in terms of units as well as in terms of amount.
Category: MBA Questions,   Published by: teswesm
MCQs:  Which of the following statements are true about Break-even analysis?
Category: MBA Questions,   Published by: teswesm
MCQs:  What will be amount of profit if Margin of safety is Rs 50,000 and P/V ratio is 25%?
Category: MBA Questions,   Published by: teswesm
MCQs:  Determine B.E.P if Sales is Rs 1,00,000, Variable cost is Rs 50,000 and Profit is Rs 20,000.
Category: MBA Questions,   Published by: teswesm
MCQs:  What will be the B.E.P if P/V ratio is 20% and Fixed cost is Rs 40,000.
Category: MBA Questions,   Published by: teswesm
MCQs:  A cost centre which relates to equipment or to location is known as
Category: MBA Questions,   Published by: teswesm
MCQs:  There are ______ types of standard used in the process of establishment of standard costing system.
Category: MBA Questions,   Published by: teswesm
MCQs:  _________reflects a level of attainment depending on the maximum possible efficiency which may never be achieved.
Category: MBA Questions,   Published by: teswesm
MCQs:  _________ is stated as a budget which is made to change as per the levels of activity attained.
Category: MBA Questions,   Published by: teswesm
MCQs:  __________ contains the picture of total plans during the budget period and it comprises information relating to sales, profit, cost, production etc.
Category: MBA Questions,   Published by: teswesm
MCQs:  _______also known as subsidiary budgets.
Category: MBA Questions,   Published by: teswesm
MCQs:  In a month, payment for salary was Rs. 5,750 when the lag in payment of salary is 1/8 month. If total salaries of current month are Rs 6,000, determine the salaries of previous month.
Category: MBA Questions,   Published by: teswesm
MCQs:  Cash budget is a __________ budget.
Category: MBA Questions,   Published by: teswesm
MCQs:  Semi-variable expenses increases with the increase in the level of activity,
Category: MBA Questions,   Published by: teswesm
MCQs:  Semi-variable cost will not be zero, even if production is nil.
Category: MBA Questions,   Published by: teswesm
MCQs:  Material sub usage variance is calculated when A) When quantity of wastage is not given B) When quality of output is not given C) When price of wastage is not given D) When total cost of output is not given
Category: MBA Questions,   Published by: teswesm
MCQs:  Material sub-usage variance is also known as
Category: MBA Questions,   Published by: teswesm
MCQs:  Material sub usage variance is measured by using the formula
Category: MBA Questions,   Published by: teswesm
MCQs:  Management auditor should be well versed with
Category: MBA Questions,   Published by: teswesm
MCQs:  Which of the following is responsibility center?
Category: MBA Questions,   Published by: teswesm