MCQs: For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The most suitable equipment for compacting clayey soils is a_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Most suitable material for highway embankments is______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The camber of shoulders in water bound macadam roads is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: In highway construction, rolling starts from________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: In the penetration macadam construction, the bitumen is__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Which of the following premix methods is used for base course ?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The suitable surfacing material for a bridge deck slab is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The thickness of bituminous carpet varies from__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Select the correct statement________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Which of the following is considered to be the highest quality construction in the group of black top pavements ?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: In hill roads the side drains arc provided________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The minimum design speed for hairpin bends in hill roads is taken as_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: In highway construction on super elevated curves, the rolling shall proceed from_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The camber for hill roads in case of bituminous surfacing is adopted as________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The property of the ingredients to separate from each other while placing the concrete is called____________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Approximate value of shrinkage strain in concrete, is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|