Estimating & Costing Mcqs


Q.  The measurement is made for stone work in square metre in case of________________?

a. Wall facing
b. Columns, lintels, copings
c. Building work
d. A. and D. of the above


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Size, capacity and materials need be specified for__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The floor area includes the area of the balcony up to_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The weight of an item is measured correct to nearest_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Berms are provided in canals if these are__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Referring of given figure, pick up the correct statement from the following?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the incorrect statement from the following _?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following __?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following ___?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following ____?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the incorrect statement from the following _____?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following ______?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement in case of water supply ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the incorrect statement from the following _______?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the incorrect statement from the following?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The slope of the outlet of ‘P trap’ below the horizontal is kept________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of half brick partition wall per mason per day is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The height of the sink of wash basin above floor level is kept____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?
Category: Civil Engineering Mcqs,   Published by: teswesm