Q.  The formula to estimate overhead cost variances is

a. Actual output * Standard overhead rate + actual variable overhead
b. Actual output * Standard overhead rate per unit - actual overhead cost
c. Actual output * Standard overhead rate per unit * actual overhead cost
d. None of the above


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Which of the following is not a cash inflow?
Category: MBA Questions,   Published by: teswesm
MCQs:  Which of the following is not a cash outflow?
Category: MBA Questions,   Published by: teswesm
MCQs:  While preparing Marginal cost and Contribution Statement, if any factor of production is key factor then ________ should be expressed in terms of per unit of Key factor.
Category: MBA Questions,   Published by: teswesm
MCQs:  Which of the following principles should be followed while making a decision to drop a product/line?
Category: MBA Questions,   Published by: teswesm
MCQs:  Rahul has an amount of Rs 3,00,000 which is invested in a business. He desires 15% return on his fund. It is known from the past cost data analysis that fixed costs are Rs 1,50,000 per annum and variable costs of operation are 60% of sales. Determine sales volume to get 15% return. Also tell shut down point of the business, if he would spend Rs 50,000 even if business has to be closed.
Category: MBA Questions,   Published by: teswesm
MCQs:  A facility, the installed capacity of which is 1,00,000 units, has budgeted 70% level of activity as Materials Rs 1,05,000, Wages Rs 1,40,000 Variable overheads Rs 70,000 and Fixed overheads Rs 20,000. Production is now proposed at 80,000 units. Determine Marginal cost p.u., Differential cost, and Differential cost p.u.
Category: MBA Questions,   Published by: teswesm
MCQs:  As per Cash flow method Increase in current liabilities and decrease in current assets are
Category: MBA Questions,   Published by: teswesm
MCQs:  In cash flow method for preparing cash budget, payment of dividends and prepaid payments are
Category: MBA Questions,   Published by: teswesm
MCQs:  Cash budget deals with historical data whereas Cash Flow Statement deals with future data.
Category: MBA Questions,   Published by: teswesm
MCQs:  Variable overhead variance is represented by expenditure variance only.
Category: MBA Questions,   Published by: teswesm
MCQs:  If the actual output is more than the budgeted output, volume variance is
Category: MBA Questions,   Published by: teswesm
MCQs:  The capacity variance arises when
Category: MBA Questions,   Published by: teswesm
MCQs:  Analysis of overhead variances can be done by
Category: MBA Questions,   Published by: teswesm
MCQs:  Given budgeted output, number of working days, fixed overheads and variable overheads are 15,000 units, 25, Rs 30,000 and Rs 45,000 respectively. The actual output, number of working days, fixed overheads and variable overheads are 16,000 units, 27, Rs 30,500 and Rs 47,000, respectively. The increase in capacity is 5%. Determine variable overhead expenditure variance and fixed overhead variance, respectively.
Category: MBA Questions,   Published by: teswesm
MCQs:  ABC Ltd is operating a system of standard costing with closing of books done every quarter. The budgeted overheads are Rs 2,55,000. Also, the overhead rate was pre-decided @ Rs 5.1 per labour hours and during a quarter actually used 52,000 labour hours, instead of 51,000 hours. The actual overheads resulted in a rate of Rs 4.9 per labour hours. What is volume variance?
Category: MBA Questions,   Published by: teswesm
MCQs:  Sales margin variance due to volume can be classified into _____parts.
Category: MBA Questions,   Published by: teswesm
MCQs:  The formula to estimate the sales margin variance due to sales mixture is
Category: MBA Questions,   Published by: teswesm
MCQs:  Sales margin variance due to sales quantities is measured as
Category: MBA Questions,   Published by: teswesm
MCQs:  When actual price is higher or lower than the standard price, then it is
Category: MBA Questions,   Published by: teswesm
MCQs:  The corrective actions after the analysis of variances has to be taken by
Category: MBA Questions,   Published by: teswesm