Estimating & Costing Mcqs


Q.  The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________?

a. 1.5 m 3
b. 2.5 m3
c. 3.5 m3
d. 5.0 m3


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  In case of laying gullies, siphons, intercepting traps, the cost includes_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The inspection pit or chamber is a manhole provided in a base drainage system________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The ‘centre line method’ is specially adopted for estimating_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The unit of measurement is per quintal for the following?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The order of booking dimensions is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The correct Prismoidal formula for volume is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the incorrect statement regarding a master trap from the following ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  period in a septic tank is assumed___________________? The detention
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the item of work not included in the plinth area estimate______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The minimum width of a septic tank is taken__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn for earth work in excavation in ordinary soil per workman per day is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The brick work is measured in sq metre, in case of_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The item of steel work which is measured in sq.m, is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The damp proof course (D.P.C.) is measured in________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The volume is measured correct to the nearest__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  88 is 1400 kg/cm2 and bond stress is 6 kg/cm2, the If tensile stress of a steel rod of diameter required bond length of the rod is____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Size, capacity and materials need be specified for__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The floor area includes the area of the balcony up to_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm