Highway Engineering Mcqs


Q.  The direct interchange ramp involves____________?

a. diverging to the right side and merging from left
b. diverging to the left side and merging from right
c. diverging to the right side and merging from right
d. diverging to the left side and merging from left


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Tyre pressure influences the______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Select the correct statement_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Rigidity factor for a tyre pressure greater than 7 kg/cm2 is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Tie bars in cement concrete pavements are at______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The function of an expansion joint in rigid pavements is to______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The maximum spacing of contraction joints in rigid pavements is_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The critical combination of stresses for corner region in cement concrete roads is____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If the group index value of subgrade is between 5 and 9, then the subgrade is treated as_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The maximum thickness of expansion joint in rigid pavements is______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The fundamental factor in the selection of pavement type is_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Maximum daily traffic capacity of bituminous pavements is______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The binder normally used in flexible pavement construction is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The most suitable equipment for compacting clayey soils is a_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Most suitable material for highway embankments is______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The camber of shoulders in water bound macadam roads is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In highway construction, rolling starts from________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In the penetration macadam construction, the bitumen is__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm