Engineering Economy Mcqs


Q.  The difference between the present and future worth of money at some time in the future is called __________________?

a. Discount
b. Deduction
c. Inflation
d. Depletion


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  What is defined as an entity which makes product, good or services available to buyer or consumer in exchange of monetary consideration ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What is a market situation whereby there is only one buyer of an item for which there is no goods substitute ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What is considered as the basic consuming or demanding unit of a commodity ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What refers to the goods and services that are desired by human and will be acquired only after all the needs have been satisfied ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What refers to the exchange mechanism that brings together the sellers and the buyers of a product, factor of production or financial security ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What refers to the goods and services that are required to support human life, needs and activities ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What is defined as any tangible economic product that contributes directly or indirectly to the satisfaction of human want ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What are the two classifications of goods and services ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What is defined as any tangible economic activity that contributes directly or indirectly to the satisfaction of human want ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What is considered as the standard unit which forms the basis of a country’s domestic money supply ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What is defines as the analysis and evaluation of the monetary consequences by using the theories and principles of economics to engineering applications, designs and projects ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  First Benchmark Publishing’s gross margin is 50% of sales. The operating costs of the publishing are estimated at 15% of sales. If the company is within the 40% tax bracket, determine the percent of sales is their profit after taxes ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A farmer selling eggs at 50 pesos a dozen gains 20%. If he sells the eggs at the same price after the costs of the eggs rises by 12.5%, how much will be his new gain in percent ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A feasibility study shows that a fixed capital investment of P10,000,000 is required for a proposed construction firm and an estimated working capital of P2,000,000. Annual depreciation is estimated to be10% of the fixed capital investment. Determine the rate of return on the total investment if the annual profit is P3,500,000?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The monthly demand for ice cans being manufactured by Mr. Camus is 3200 pieces. With a manual operated guillotine, the unit cutting cost is P25.00. An electrically operated hydraulic guillotine was offered to Mr. Camus at a price of P275,000.00 and which cuts by 30% the unit cutting cost. Disregarding the cost of money, how many months will Mr. Camus be able to recover the cost of the machine if he decides to buy now ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Engr. Trinidad loans from a loan firm an amount of P100,000 with a rate of simple interest of 20% but the interest was deducted from the loan at the time the money was borrowed. If at the end of one year, she has to pay the full amount of P100,000, what is the actual rate of interest ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A loan of P5,000 is made for a period of 15 months, at a simple interest rate of 15%, what future amount is due at the end of the loan period ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Mr. Bacani borrowed money from the bank. He received from the bank P1,842 and promised to repay P2,000 at the end of 10 months. Determine the rate of simple interest?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A college freshman borrowed P2,000 from a bank for his tuition fee and promised to pay the amount for one year. He received only the amount of P1,920 after the bank collected the advance interest of P80.00. What was the rate of discount ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A man invested P110,000 for 31 days. The net interest after deducting 20% withholding tax is P890.36. Find the rate of return annually?
Category: Civil Engineering Mcqs,   Published by: teswesm