Q.  The critical path of a network represents_______________________?

a. the minimum time required for completion of project
b. the maximum time required for completion of project
c. maximum cost required for completion of project
d. minimum cost required for completion of project
e. none of the above


ANSWER: See Answer
 
No explanation is available for this question!
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  The linear programming techniques can be applied successfully to industries like_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The mathematical technique for finding the best use of limited resources in an optimum manner is known as___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In A-B-C control policy, maximum attention is given to__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  One of the basic essentials of an incentive plan is that_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Which of the following is not wage incentive plan_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the incorrect statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  A file removes the metal during___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In a _____________ , both cutting and non-cutting operations are performed at one station of the press in every stroke of the ram?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  A neutral flame is obtained by supplying___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The cold working of metals is carried out_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Lancing is the operation of _________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In spot welding, the spacing between two spot weld should not be less than _______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The shrinkage allowance for cast iron pattern is________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Tandem drawing of wires and tubes is necessary because_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The operation of straightening a curved sheet metal, is known as____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Which of the following statement is wrong ?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts