Q.  The ‘centre line method’ is specially adopted for estimating_________________?

a. Circular buildings
b. Hexagonal buildings
c. Octagonal buildings
d. All the above


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Pick up the incorrect statement from the following _?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following __?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following ___?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following ____?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the incorrect statement from the following _____?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following ______?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement in case of water supply ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the incorrect statement from the following _______?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the incorrect statement from the following?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The slope of the outlet of ‘P trap’ below the horizontal is kept________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of half brick partition wall per mason per day is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The height of the sink of wash basin above floor level is kept____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the item whose weight is added to the weight of respective item, is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  S: 1 and length is______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following _______?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following ________?
Category: Civil Engineering Mcqs,   Published by: teswesm