MCQs: For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The height of the sink of wash basin above floor level is kept____________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Pick up the item whose weight is added to the weight of respective item, is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: S: 1 and length is______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Pick up the correct statement from the following _______?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Pick up the correct statement from the following ________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Pick up the correct statement from the following _________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The load stress of a section can be reduced by______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The maximum ratio of span to depth of a slab simply supported and spanning in one direction, is______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: the column head support a flat slab, is generally kept The diameter of_____________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The floor slab of a building is supported on reinforced cement floor beams. The ratio of the end and intermediate spans is kept______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: In case the factor of safety against sliding is less than 1.5, a portion of slab is constructed downwards at the end of the heel slab, which is known as___________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Lapped splices in tensile reinforcement are generally not used for bars of size larger than______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: According to I.S. : 456, slabs which span in two directions with corners held down, are assumed to be divided in each direction into middle strips and edge strips such that the width of the middle strip, is______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: If the width of the foundation for two equal columns is restricted, the shape of the footing generally adopted, is__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Minimum spacing between horizontal parallel reinforcement of the same size should not be less than________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: For a ribbed slab______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|