Q.  The assumption on which the trapezoidal formula for volumes is based, is________________?

a. The end sections are parallel planes
b. The mid-area of a pyramid is half the average area of the ends
c. The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied
d. All the above


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  The trap which is provided to disconnect the house drain from the street sewer is called_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The measurement is not made in square metres in case of________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  While preparing a detailed estimate__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The most reliable estimate is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  According to ISI method of measurement, the order of the sequence is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The item of the brick structure measured in sq.m, is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Anti-siphonage pipe is connected to__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The concrete work for the following part of the building of specified thickness is measured in square metres_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The measurement is made for stone work in square metre in case of________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of 12 mm plastering with cement mortar is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Carpet area does not include the area of_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In case of laying gullies, siphons, intercepting traps, the cost includes_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The inspection pit or chamber is a manhole provided in a base drainage system________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The ‘centre line method’ is specially adopted for estimating_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm