Production Technology Mcqs

Q.  The assumption in PERT is__________________?

a. a project will always be behind schedule, if left uncorrected
b. cost of project will always be more than the estimated cost, if no timely corrections are taken
c. a project can be subdivided into a set of predictable, independent activities
d. activities are fixed and can’t be changed
e. commissioning time can be changed, if activities are behind schedule


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  PERT stands for k (fit) project evaluation and review technique__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT is the__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Work study comprises following main techniques_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  CPM is the___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT and CPM are__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Bin card is used in__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Replacement studies are made on the fol-lowing basis_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant_____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The two-bin system is concerned with_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The linear programming techniques can be applied successfully to industries like_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The mathematical technique for finding the best use of limited resources in an optimum manner is known as___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In A-B-C control policy, maximum attention is given to__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  One of the basic essentials of an incentive plan is that_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Which of the following is not wage incentive plan_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the incorrect statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  A file removes the metal during___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts