Software Management Mcqs


Q.  SPMP stands for__________________?

a. Software Project Manager’s Plan
b. Software Project Management Plan
c. Software Product Management Plan
d. Software Product Manager’s Plan


ANSWER: See Answer
 
After planning is complete, documenting of the plans is done in a Software Project Management Plan(SPMP) document.
MCQs:  Which of the following term is best defined by the statement:”the degree of uncertainty that the product will meet its requirements and be fit for its intended use.”?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following term is best defined by the statement: “There will be a change of organizational management with different priorities.”?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which risks are associated with constraints imposed by management or the marketplace ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is a systematic attempt to specify threats to the project plan ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What threatens the quality and timeliness of the software to be produced ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a business risk ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which risks are associated with the overall size of the software to be built or modified ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What threatens the viability of the software to be built ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  COCOMO stands for____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which one is not a risk management activity ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  COCOMO was developed initially by _____________________ ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  COCOMO-II was developed at _____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What all has to be identified as per risk identification ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which one is not a size measure for software product ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Estimation of size for a project is dependent on___________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which one is not a stage of COCOMO-II ?
Category: Software Engineering Mcqs,   Published by: teswesm