Q.  Slack of various events on the critical path in PERT/CPM chart___________________?

a. increases continuously
b. decreases continuously
c. remains constant
d. may increase or decrease depending on various factors
e. unpredictable


ANSWER: See Answer
 
No explanation is available for this question!
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  The difference between the time available to do the job and the time required to do the job, is known as_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  A dummy activity________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Routing assists engineers in deciding in advance___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The disadvantage of product layout is_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct step used for scheduling a project by C.P.M.__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Bar charts are suitable for_____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In perpetual inventory control, the material is checked as it reaches its__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The reasons which are basically responsible for the formation of a queue should be that ___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT stands for k (fit) project evaluation and review technique__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT is the__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Work study comprises following main techniques_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  CPM is the___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT and CPM are__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Bin card is used in__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Replacement studies are made on the fol-lowing basis_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant_____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The two-bin system is concerned with_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The linear programming techniques can be applied successfully to industries like_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The mathematical technique for finding the best use of limited resources in an optimum manner is known as___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts