Soil Mechanics & Foundation Engineering Mcqs


Q.  Select the incorrect statement ____?

a. In a direct shear box test, the plane of shear failure is predetermined
b. Better control is achieved on the drainage of the soil in a triaxial compression test
c. Stress distribution on the failure plane in the case of triaxial compression test is uniform
d. Unconfined compression test can be carried out on all types of soils


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Pick up the correct statement regarding the centre line method of estimating a building?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The following item of earth work is not measured separately ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The area of the cross-section of a road fully in banking shown in the given figure, is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The measurement is made in square metre in case of_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Cost of fittings and their fixing is specified for the following sanitary fittings________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For the construction of buildings, the subheads of the estimate are________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The area is measured correct to the nearest___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the excavation where measurements are made in square metres for payment ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The trap which is provided to disconnect the house drain from the street sewer is called_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The measurement is not made in square metres in case of________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  While preparing a detailed estimate__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The most reliable estimate is_________________?