MCQs: Cost of fittings and their fixing is specified for the following sanitary fittings________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: For the construction of buildings, the subheads of the estimate are________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The area is measured correct to the nearest___________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Pick up the excavation where measurements are made in square metres for payment ?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The trap which is provided to disconnect the house drain from the street sewer is called_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The measurement is not made in square metres in case of________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: While preparing a detailed estimate__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The most reliable estimate is_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: According to ISI method of measurement, the order of the sequence is_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The item of the brick structure measured in sq.m, is___________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Anti-siphonage pipe is connected to__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|