Soil Mechanics & Foundation Engineering Mcqs


Q.  Rankine’s theory of earth pressure assumes that the back of the wall is_______________?

a. plane and smooth
b. plane and rough
c. vertical and smooth
d. vertical and rough


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Select the correct statement ____?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Select the correct statement _____?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The rate of an item of work depends on_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The main factor to be considered while preparing a detailed estimate, is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The plinth area of a building not includes_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  While estimating the qualities for the construction of a building, the correct metric unit is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The brick work is not measured in cu m in case of_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The assumption on which the trapezoidal formula for volumes is based, is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  According to Indian Standards Institute, the actual size of modular bricks is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The cross -sections for a highway is taken at_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In the mid-section formula__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Brick walls are measured in sq. m if the thickness of the wall is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement regarding the centre line method of estimating a building?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The following item of earth work is not measured separately ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The area of the cross-section of a road fully in banking shown in the given figure, is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The measurement is made in square metre in case of_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm