Q.  Preliminary project report for a road project must contain___________________?

a. the detailed estimated cost based on detailed design
b. the several alternatives of the project that have been considered
c. the soil survey, traffic survey, concept design and approximate cost
d. the contract documents for inviting tenders


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  For a given size of bucket, the ideal output of a dragline will be least in_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following earth moving machines has the shortest cycle time?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Crash project duration is obtained by summing the________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The constraints in case of resource smoothening operation would be_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Slack time refers to_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Economic saving of time results by crashing_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The direct cost of a project with respect to normal time is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The time with which direct cost does not reduce with the increase in time is known as_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What estimate would you give for the variance in above problem ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The independent float affects only_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Free float for any activity is defined as the difference between__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Total float for any activity is defined as the difference between________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Free float is mainly used to_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In the network shown in Fig. (15 fig) the latest start time of an activity 4-5 is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Earliest finish of an activity is always_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In PERT analysis, the time estimates of activities and probability of their occurrence follow_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  PERT technique of network analysis is mainly useful for__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Select the correct statement_______?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Select the incorrect statement_______?
Category: Civil Engineering Mcqs,   Published by: teswesm