Estimating & Costing Mcqs


Q.  Pick up the item of work not included in the plinth area estimate______________?

a. Wall thickness
b. Room area
c. W.C. area
d. Courtyard area


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Pick up the incorrect statement from the following?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The slope of the outlet of ‘P trap’ below the horizontal is kept________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of half brick partition wall per mason per day is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The height of the sink of wash basin above floor level is kept____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the item whose weight is added to the weight of respective item, is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  S: 1 and length is______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following _______?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following ________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Pick up the correct statement from the following _________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The load stress of a section can be reduced by______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The maximum ratio of span to depth of a slab simply supported and spanning in one direction, is______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  the column head support a flat slab, is generally kept The diameter of_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The floor slab of a building is supported on reinforced cement floor beams. The ratio of the end and intermediate spans is kept______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In case the factor of safety against sliding is less than 1.5, a portion of slab is constructed downwards at the end of the heel slab, which is known as___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Lapped splices in tensile reinforcement are generally not used for bars of size larger than______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  According to I.S. : 456, slabs which span in two directions with corners held down, are assumed to be divided in each direction into middle strips and edge strips such that the width of the middle strip, is______________?
Category: Civil Engineering Mcqs,   Published by: teswesm