Waste Water Engineering Mcqs


Q.  Pick up the incorrect statement from the following?

a. The process of decomposing the organic matter under controlled anaerobic conditions, is called sludge digestion
b. Sludge digestion is carried out in sludge tank
c. The gases produced in sludge digestion process, contain 75% carbon dioxide
d. The gases produced in sludge digestion process, contain 75% methane


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  An artesian aquifer is the one where______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A multipurpose reservoir is the one which is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The water stored in the reservoir below the minimum pool level is called_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Trap efficiency of a reservoir is a function of_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  When the upstream face of a gravity dam is vertical, then the intensity of water pressure at the water surface and at the base respectively will be_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The uplift pressure on the face of a drainage gallery in a dam is taken as_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Hydrodynamic pressure due to earthquake acts at a height of_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  When the reservoir is full, the maximum compressive force in a gravity dam is produced______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For wave action in dams, the maximum height of freeboard is generally taken to be equal to_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The most suitable material for the central impervious core of a zoned embankment type dam is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Seepage through foundation in an earthen dam is controlled by providing___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following spillways is least suitable for an earthen dam ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In a chute spillway, the flow is usually____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If there are two canals taking off from each flank of a river, then there will be____________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The main function of a divide wall is to_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  As compared to crest of the normal portion of the weir, the crest of the under sluice portion of weir is kept at_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  According to Khosla’s theory, the exit gradient in the absence of a downstream cutoff is_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The ratio of average values of shear stresses produced on the bed and the banks of a channel due to flowing water is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  As per Lacey’s theory, the silt factor is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following canal structures is used to remove surplus water from an irrigation channel into a natural drain ?
Category: Civil Engineering Mcqs,   Published by: teswesm