MCQs: The area under the Beta – distribution curve is divided into two equal parts by_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Which of the following does not represent an activity?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Latest start of an activity is always________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Whenever an activity has zero total float, then_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Critical path_____________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The reduction in project time normally results in_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The process of incorporating changes and rescheduling or replanning is called_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The normal time required for the completion of project in the above problem is_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Updating may result in_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Interfering float is the difference between__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: A tractor whose weight is 20 tonnes has a drawbar pull of 2500 kg, when operated on a level road having a rolling resistence of 30 kg per tonne. If this tractor is operated on a level road having a rolling resistance of 40 kg per tonne, then the drawbar pull of the tractor will________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Which of the following excavators is most suitable for digging under water?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: For which of the following materials, the output of power shovels for a fixed shovel size will be maximum_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Consider the following statements for a power shovel?
(i) Output can be increased by reducing the angle of swing for a given depth of cut
(ii) For a given angle of swing, output will be maximum at optimum depth of cut
(iii) Output can be increased by keeping the depth of cut less than optimum depth
(iv) Output can be increased by increasing the size of shovel
select the correct statements?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: If the output of a dragline for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120 % of optimum depth of cut will be_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: A machine is purchased for Rs. 10,000,00/- and has an estimated life of 10 years. The salvage value at the end of 10 years is Rs. 1,50,000/-. The book value of the machine at the end of 5 years using general straight line method of evaluation of depreciation is__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|