Q.  Pick up the incorrect statement from the following. A critical ratio scheduling____________________?

a. establishes the relative priorities among various activities on a common basis
b. determines the status of each activity
c. adjusts automatically changes in activity progress
d. is a dynamic system
e. none of the above


ANSWER: See Answer
 
No explanation is available for this question!
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  Critical path moves along the activities having total float of_____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The critical path of a network represents_______________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The critical activity has____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The probability distribution of project completion in PERT follows following distribution_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The difference between the time available to do the job and the time required to do the job, is known as_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  A dummy activity________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Routing assists engineers in deciding in advance___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The disadvantage of product layout is_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the correct step used for scheduling a project by C.P.M.__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Bar charts are suitable for_____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In perpetual inventory control, the material is checked as it reaches its__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The reasons which are basically responsible for the formation of a queue should be that ___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT stands for k (fit) project evaluation and review technique__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT is the__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Work study comprises following main techniques_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  CPM is the___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT and CPM are__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Bin card is used in__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Replacement studies are made on the fol-lowing basis_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts