Production Technology Mcqs

Q.  Micro motion study is__________________?

a. analysis of a man-work method by using a motion picture camera with a timing device in the field of view
b. motion study* observed on enhanced time intervals
c. motion study of a sequence of operations conducted systematically
d. study of man and machine conducted simultaneously
e. scientific, analytically procedure for determining optimum work method


ANSWER: See Answer
 
No explanation is available for this question!
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  Which of the following equations is not in conformity with others______________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The basic difference between PERT and CPM is that_____________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Queuing theory is used for____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Queuing theory is associated with __________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Monte Carlo solutions in queuing theory are extremely useful in queuing problems_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  A milestone chart_______________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The first method invented for planning projects was________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The time of completing a project in network analysis is given by following time of the critical activity meeting at the finalitiode_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Emergency rush order can be pushed more effectively in__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The performance of a specific task in CPM is known as ______________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The artificial activity; which indicates that an activity following it cannot be started unless, the preceding activity is complete, is known as_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good______________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The probability distribution of activity times in PERT follows following distribution__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  If TL is the largest allowable event occurrence time, total activity slack (s) is equal to__________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is Known as_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Critical Path Net Work helps an engineer_________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  The time which results in the least possible direct cost of an activity is known as________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  Pick up the incorrect statement from the following. A critical ratio scheduling____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  CPMis___________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts
MCQs:  PERT/CPM, techniques can be used for following applications____________________?
Category: Mechanical Engineering Questions,   Published by: T-Code Scripts