MCQs: Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: An excavator costs Rs. 20,00,000/- and has an estimated life of 8 years. It has no salvage value at the end of 8 years. The book value of the excavator at the end of 3 years using general double declining balance method is__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of swing Reason R: If the angle of swing is decreased, the cycle time will be decreased_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: For a given size of bucket, the ideal output of a dragline will be least in_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Which of the following earth moving machines has the shortest cycle time?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Crash project duration is obtained by summing the________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The constraints in case of resource smoothening operation would be_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Slack time refers to_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Economic saving of time results by crashing_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The direct cost of a project with respect to normal time is________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The time with which direct cost does not reduce with the increase in time is known as_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: What estimate would you give for the variance in above problem ?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: The independent float affects only_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Free float for any activity is defined as the difference between__________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Total float for any activity is defined as the difference between________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Free float is mainly used to_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively___________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: In the network shown in Fig. (15 fig) the latest start time of an activity 4-5 is_________________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: Earliest finish of an activity is always_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|
MCQs: In PERT analysis, the time estimates of activities and probability of their occurrence follow_______________?
Category: Civil Engineering Mcqs, Published by: teswesm
|