Construction Planning & Management Mcqs


Q.  In the time-cost optimisation, using CPM method for network analysis, the crashing of the activities along the critical path is done starting with the activity having________________?

a. longest duration
b. highest cost slope
c. least cost slope
d. shortest duration


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  An excavator costs Rs. 20,00,000/- and has an estimated life of 8 years. It has no salvage value at the end of 8 years. The book value of the excavator at the end of 3 years using general double declining balance method is__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of swing Reason R: If the angle of swing is decreased, the cycle time will be decreased_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For a given size of bucket, the ideal output of a dragline will be least in_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following earth moving machines has the shortest cycle time?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Crash project duration is obtained by summing the________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The constraints in case of resource smoothening operation would be_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Slack time refers to_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Economic saving of time results by crashing_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The direct cost of a project with respect to normal time is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The time with which direct cost does not reduce with the increase in time is known as_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  What estimate would you give for the variance in above problem ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The independent float affects only_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Free float for any activity is defined as the difference between__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Total float for any activity is defined as the difference between________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Free float is mainly used to_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If an activity has its optimistic, most likely and pessimistic times as 2, 3 and 7 respectively, then its expected time and variance are respectively___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In the network shown in Fig. (15 fig) the latest start time of an activity 4-5 is_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Earliest finish of an activity is always_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  In PERT analysis, the time estimates of activities and probability of their occurrence follow_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm