Construction Planning & Management Mcqs

Q.  In the critical path method of construction planning, Free Float can be_____________?
Consider the following statements ?
1. greater than Total Float.
2. greater than Independent Float
3. equal to Total Float.
4. less than Independent Float. Of these statements


a. 1 and 4 are correct
b. 2 and 3 are correct
c. 1 and 4 are correct
d. 1 and 2 are correct


ANSWER: See Answer
 
No explanation is available for this question!
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  The original cost of an equipment is Rs.10,000/-. Its salvage value at the end of its total useful life of five years is Rs. 1,000/-. Its book value at the end of two years of its useful life (as per straight line method of evaluation of depreciation) will be________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  A contractor has two options : Invest his money in project A or (II) : Invest his money in project B. If he decides to invest in A, for every rupee invested, he is assured of doubling his money in ten years. If he decides to invest in B, he is assured of making his money 1.5 times in 5 years. If the contractor values his money at 10% interest rate, he______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Mobilization advance up to 10% of the cost of work is given to a contractor_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  In time-cost optimization of a project, crashing is done____________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  At a work site, statistical quality control of concrete means________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  In the bar chart planning____________? Consider the following statements? 1. interdependence of the operations cannot be portrayed 2. progress of work can be measured 3. spare time of the activities can be determined 4. schedule cannot be updated
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks, the probability of completing the project in 50 weeks and 65 weeks respectively will be__________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  A machine costs Rs. 20000 and its useful life is 8 years. The money is borrowed at 8% interest per annum. The capital recovery factor at 8% interest per annum for 8 years is 0.174. The annual equipment cost of the machine will be________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be__________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  A four wheel trac*or whose operating weight is 12000 kg is pulled along a road having a rising slope of 2% at a uniform speed. Assume grade resistance factor = 10 kg/tonne. The tension in the tow cable is 720 kg. The rolling resistance of the road will be___________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The grade resistance factor for an earth moving machine can be obtained by multiplying grade percentage by a factor approximately equal to_________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following surfaces will give highest rolling resistance for a rubber tyred vehicle?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which one of the following surfaces will give highest coefficient of traction while using crawler track tractors?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  An excavator costs Rs. 20,00,000/- and has an estimated life of 8 years. It has no salvage value at the end of 8 years. The book value of the excavator at the end of 3 years using general double declining balance method is__________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of swing Reason R: If the angle of swing is decreased, the cycle time will be decreased_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  For a given size of bucket, the ideal output of a dragline will be least in_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following earth moving machines has the shortest cycle time?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Crash project duration is obtained by summing the________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The constraints in case of resource smoothening operation would be_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Slack time refers to_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts