Production Technology Mcqs


Q.  In order that linear programming techniques provide valid results________________?

a. relations between factors must be linear (positive)
b. relations between factors must be linear (negative)
c. A. or B.
d. only one factor should change at a time, others remaining constant
e. none of the above


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is Known as_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Critical Path Net Work helps an engineer_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  The time which results in the least possible direct cost of an activity is known as________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Pick up the incorrect statement from the following. A critical ratio scheduling____________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  CPMis___________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  PERT/CPM, techniques can be used for following applications____________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Descripancies of bar chart techniques are________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Slack of various events on the critical path in PERT/CPM chart___________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Activity s,lack or float of any event on a PERT/CPM chart is represented by__________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  An event is indicated on the network by_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Positive slack on a PERT indicates that project is________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  In PERT analysis, critical path is obtained by joining events having___________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  In a PERT chart___________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Pessimistic time is___________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  The important file in making a PERT is__________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  The assumption in PERT is__________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Criticalpath on PERT/CPM chart is obtained by joining the events having____________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  O on a PERT/CPM chart represents____________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  PERT analysis is based on____________________?
Category: Mechanical Engineering Questions,   Published by: teswesm