Production Technology Mcqs


Q.  In a PERT chart___________________?

a. all activities should be numbered
b. only important activities should be numbered
c. only critical activities are numbered
d. only selected activities are numbered
e. no activity is numbered


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  In perpetual inventory control, the material is checked as it reaches its__________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  The reasons which are basically responsible for the formation of a queue should be that ___________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  PERT stands for k (fit) project evaluation and review technique__________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  PERT is the__________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Work study comprises following main techniques_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  CPM is the___________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  PERT and CPM are__________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Bin card is used in__________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Replacement studies are made on the fol-lowing basis_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant_____________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  The two-bin system is concerned with_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  The linear programming techniques can be applied successfully to industries like_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  The mathematical technique for finding the best use of limited resources in an optimum manner is known as___________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  In A-B-C control policy, maximum attention is given to__________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  According to Rowan plan, if H = hourly rate, A = actual time and S = standard time, then wages will be___________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  One of the basic essentials of an incentive plan is that_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Which of the following is not wage incentive plan_________________?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: teswesm
MCQs:  Pick up the correct statement from the following?
Category: Mechanical Engineering Questions,   Published by: teswesm