Irrigation, Water Resources Engineering & Hydrology Mcqs


Q.  In a chute spillway, the flow is usually____________________?

a. uniform
b. subcritical
c. critical
d. super critical


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  A runoff river plant is____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A runoff river plant_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The ratio of the average load to the installed capacity of the plant whose reserve capacity is zero will be equal to__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A hyetograph is a graphical representation of___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The maximum average depth due to one day storm over an area of 100 km2 is 100 mm. Depth-Area-Duration (DAD. curves indicate that for the same area of 100 km2 the maximum average depth for a 3 hour storm will be__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The most suitable chemical which can be applied to the water surface for reducing evaporation is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The stage of river carrying a discharge of Q m7sec at a point is 10 m and slope of water surface is (1/4000). The discharge of a flood at the same point and same stage of 10 m with a water surface slope of(l/1000) will be________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The flow-mass curve is graphical representation of__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The shape of recession limb of a hydrograph depends upon________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For a catchment area of 120 km2, the equilibrium discharge in m3/hour of an S-curve obtained by the summation of 6 hour unit hydro graph is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  For an annual flood series arranged in descending order of magnitude, the return for a magnitude listed at position period m in a total data N is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A unit hydro graph has one unit of_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If the risk of a flood occurring in the next 10 years is accepted to 10%, then the return period for design should be__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If the demand line drawn from a ridge in a flow mass curve does not intersect the curve again, it indicates that______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The stream which does not have any base flow contribution is called________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The maximum rainfall depth of 300 mm in 24 hours has a return period of 100 years. The probability of 24 hours rainfall equal to or greater than 300 mm occurring at least once in 10 years is given by_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A hydroelectric scheme operating under a head of 80 m will be classified as_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm