Irrigation, Water Resources Engineering & Hydrology Mcqs


Q.  If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be________________?

a. aqueduct
b. superpassage
c. syphon
d. syphon aqueduct


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  A unit hydro graph has one unit of_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If the risk of a flood occurring in the next 10 years is accepted to 10%, then the return period for design should be__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If the demand line drawn from a ridge in a flow mass curve does not intersect the curve again, it indicates that______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The stream which does not have any base flow contribution is called________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The maximum rainfall depth of 300 mm in 24 hours has a return period of 100 years. The probability of 24 hours rainfall equal to or greater than 300 mm occurring at least once in 10 years is given by_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A hydroelectric scheme operating under a head of 80 m will be classified as_____________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The net head under which the turbine reaches its peak efficiency at synchronous speed is called________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The net speed under which the turbine reaches its peak efficiency is called_________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Lining of irrigation channels________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  A river training work is generally required when the river is_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The main cause of meandering is________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Tortuosity of a meandering river is the ratio of__________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The aqueduct or superpassage type of works are generally used when_______________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  The drainage water intercepting the canal can be disposed of by passing the canal below the drainage in___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following canal outlets maintains a constant discharge ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following can be used as a meter fall ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following types of falls use parabolic glacis for energy dissipation ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is a flexible outlet ?
Category: Civil Engineering Mcqs,   Published by: teswesm
MCQs:  If the critical shear stress of a channel is xc, then the average value of shear stress required to move the grain on the bank is___________________?
Category: Civil Engineering Mcqs,   Published by: teswesm