Software Reliability & Fault Tolerance Mcqs


Q.  How many product quality factors are proposed in McCall quality model ?

a. 2
b. 3
c. 11
d. 8


ANSWER: See Answer
 
McCall quality model has three product quality factors namely: Product revision, Product operation, Product Transition .
MCQs:  Non-conformance to software requirements is known as___________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  The degree to which the design specifications are followed during manufacturing is known as________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  According to ISO 9001, inspection and testing comes under which management responsibility ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  When code is made available to others, it goes in a/an____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a main phase in Configuration Management (CM) Process ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  SCM stands for_________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is validating the completeness of a product ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is a collection of software elements treated as a unit for the purposes of SCM ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is one or more software configuration items that have been formally reviewed and agreed upon and serve as a basis for further development ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is group with the responsibility for reviewing and approving changes to baselines ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  What is a specific instance of a baseline or configuration item ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a part of Software Configuration Management Basics ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is a software process ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not included in Issues Meetings ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a conflict in software development team ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Which of the following is not a typical environment in communication facilitation ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Why is software difficult to build ?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Debugging Program is a program which runs concurrently with the program under test & provide commands to_____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Beta Testing is done by____________________?
Category: Software Engineering Mcqs,   Published by: teswesm
MCQs:  Execution Verifier is a dynamic tool that is also known as_____________________?
Category: Software Engineering Mcqs,   Published by: teswesm