Software Processes, Models & Software Development Mcqs

Q.  How is plan driven development different from agile development ?

a. Outputs are decided through a process of negotiation during the software development process
b. Specification, design, implementation and testing are interleaved
c. Iteration occurs within activities
d. All of the mentioned


ANSWER: See Answer
 
A plan-driven approach to software engineering is based around separate development stages with the outputs to be produced at each of these stages planned in advance.
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  Selection of a model is based on_____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The longer a fault exists in software__________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which one of the following is not a fundamental activity for software processes in software engineering ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which phase of the RUP is used to establish a business case for the system ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The RUP is normally described from three perspectives-dynamic, static & practice.What does static perspective do ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Choose an internal software quality from given below________________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  How is Incremental Model different from Spiral Model ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  How is WINWIN Spiral Model different from Spiral Model ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  What is the major advantage of using Incremental Model ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The spiral model was originally proposed by____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which level of CMM is for process management ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Software reliability is defined with respect to____________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Failure In Time (FIT) is another way of reporting __________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  In ISO 9126, time behavior and resource utilization are a part of___________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  MTTF stands for___________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a Probabilistic Model ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  IMC Networks is a leading __________________ certified manufacturer of optical networking and LAN/WAN connectivity solutions for enterprise, telecommunications and service provider applications ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  How many levels are present in CMM ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Exception handling is a type of_________________?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which one is not a software quality model ?
Category: Software Engineering Mcqs,   Published by: T-Code Scripts