Q.  From the following give three major categories of risk, 1) Schedule risk 2) Project risk 3) Technical risk 4) Business risk

a. 1,2 and 3
b. 2,3 and 4
c. 1,2 and 4
d. 1,3 and 4


ANSWER: See Answer
 
No explanation is available for this question!
MCQs:  Which is not a step of Requirement Engineering?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Which of the level carries out goal, objective, work tasks, work products and other activities of the software process?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  If you have no clue of how to improve the process for the quality software which model is used?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  In Software validation, requirements can be checked against following conditions: 1) If they can be practically implemented 2) If they are valid and as per functionality and domain of software 3) If there are any ambiguities 4) If they are completed
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  In OOD, the attributes(data variables) and methods( operation on the data) are bundled together is called _______ .
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Which design defines the logical structure of each module and their interfaces that is used to communicate with other modules?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Which tools are used in Implementation, Testing and Maintenance?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Which tools are used for project planning, cost, effort estimation, project scheduling and resource planning?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Which design deals with the implementation part in which it shows a system and its sub-systems in the previous two designs?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Modularization is a technique to divide a software system into multiple discrete and independent modules.
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  What is the project and process level that provides the Quality Metric benefit?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Cohesion metrics and coupling metrics are metrics in which level of design?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Which condition defines the circumstances for a particular operation is valid?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Which subsystem implements a repository that encompasses the following elements, 1) Content database 2) Database capabilities 3) Configuration management functions
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Which is not a SQA activity?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  PAD is metric indicates the number of classes that can access another class attributes and a violation of encapsulation.
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Find out which phase is not available in SDLC?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Which of the following is/are considered stakeholder in the software process?
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Software components provide interfaces, which can be used to establish communication among different components.
Category: Computer Science MCQs,   Published by: T-Code Scripts
MCQs:  Which SDLC activity does the user initiates the request for a desired software product?
Category: Computer Science MCQs,   Published by: T-Code Scripts