Strength of Materials Mcqs

Q.  Frictional force encountered after commencement of motion is called________________?

a. post friction
b. limiting friction
c. kinematic friction
d. frictional resistance
e. dynamic friction


ANSWER: See Answer
 
No explanation is available for this question!
TasDia Network - Mcqs | Signature | Lyrics
MCQs:  Which of the following is not a scalar quantity__________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The forces, which meet at one point, but their lines of action do not lie in a plane, are called______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not the unit of pressure ?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The unit of work or energy in S.I. units is________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is a weakness of bar chart ?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following is not a PERT event ?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The area under the Beta – distribution curve is divided into two equal parts by_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Which of the following does not represent an activity?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Latest start of an activity is always________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Whenever an activity has zero total float, then_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Critical path_____________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The reduction in project time normally results in_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The process of incorporating changes and rescheduling or replanning is called_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  The normal time required for the completion of project in the above problem is_______________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Updating may result in_________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  Interfering float is the difference between__________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts
MCQs:  A tractor whose weight is 20 tonnes has a drawbar pull of 2500 kg, when operated on a level road having a rolling resistence of 30 kg per tonne. If this tractor is operated on a level road having a rolling resistance of 40 kg per tonne, then the drawbar pull of the tractor will________________?
Category: Civil Engineering Mcqs,   Published by: T-Code Scripts